全自動攪拌車告訴大家夏季如何進行施工?
現(xiàn)在施工隊伍是在不斷的擴大的,所以我們要加強相關(guān)的配合,更好的保證我們的施工質(zhì)量的提高,所以需要全自動攪拌車廠家向我們提出建議,那么我們應(yīng)該如何加強施工質(zhì)量呢?
Now the construction team is constantly expanding, so we need to strengthen the relevant cooperation to better ensure the improvement of our construction quality, so we need to put forward suggestions to us from the fully automatic mixer manufacturer, so how should we strengthen the construction quality?
1、再進行澆注之前,需要對模板和鋼筋上殘留的污漬進行。要在混凝土初凝后,及時得到養(yǎng)護,用草包覆蓋,并澆水養(yǎng)護,避免混凝土表面水分蒸發(fā)過快,使混凝土表面發(fā)生開裂。
1. Before pouring again, it is necessary to remove the residual stains on the formwork and reinforcement. After the initial setting of the concrete, it should be cured in time, covered with straw bags, and watered for curing, so as to avoid the rapid evaporation of water on the concrete surface and cracking of the concrete surface.
2、全自動攪拌車廠家告訴大家在施工的過程中要做到及時的觀察施工質(zhì)量,這樣才能及時配合做好混凝土配合比和坍落度的調(diào)整工作,讓我們的施工安 全得到更好的保證。
2. The full-automatic mixer manufacturer tells us that we should observe the construction quality in time in the process of construction, so as to timely cooperate with the adjustment of concrete mix proportion and slump, so as to better guarantee our construction safety.
3、當(dāng)遇到,項目部應(yīng)成立高溫施工緊急情況應(yīng)急領(lǐng)導(dǎo)小組,負(fù)責(zé)應(yīng)急救援工作的指揮、協(xié)調(diào)工作,由項目經(jīng)理擔(dān)任領(lǐng)導(dǎo)小組組長。
3. In case of emergency, the project department shall set up an emergency leading group for high temperature construction, which shall be responsible for the command and coordination of emergency rescue work, with the project manager as the leader of the leading group.
4、夏季高溫到來之前,組織有關(guān)人員按照方案要求進行技術(shù)交底,提出夏季高溫計劃,為施工提供技術(shù)準(zhǔn)備。
4. Before the arrival of summer high temperature, organize relevant personnel to carry out technical disclosure according to the scheme requirements, put forward summer high temperature plan, and provide technical preparation for construction.
全自動攪拌車廠家要告訴大家的相關(guān)的問題,希望大家要做到合理的調(diào)整,這樣才能保證我們的施工安 全,讓我們的施工效果更加的具有保障。
Automatic mixer manufacturers to tell you the relevant problems, I hope you want to do reasonable adjustment, so as to ensure our construction safety, so that our construction effect is more guaranteed.