混凝土攪拌機(jī)不會(huì)轉(zhuǎn)了是怎么回事?
混凝土攪拌機(jī)不會(huì)轉(zhuǎn)了是怎么回事?下面中科攪拌機(jī)就教大家遇到這種情況該怎么辦。
What's wrong with the concrete mixer? Next, we will teach you how to do in this situation.
1、混凝土攪拌機(jī)應(yīng)設(shè)置在平整的位置,用方木墊起前后輪軸,使輪胎擱高架空,避免在開動(dòng)時(shí)發(fā)作走動(dòng)。
1. The concrete mixer should be set in a flat position, and the front and rear axles should be padded with square wood to make the tires empty, so as to avoid moving when starting.
2、混凝土攪拌機(jī)應(yīng)實(shí)施二級(jí)漏電維護(hù),上班前電源接通后,有必要仔細(xì)檢查,經(jīng)空車試轉(zhuǎn)認(rèn)為合格,方可運(yùn)用。試作業(yè)時(shí)應(yīng)檢驗(yàn)拌筒轉(zhuǎn)速是否合適,一般狀況下,空車速度比重車(裝料后)稍快2~3轉(zhuǎn),如相差較多,應(yīng)調(diào)整動(dòng)輪與傳動(dòng)輪的份額。
2. The concrete mixer shall be subject to secondary leakage maintenance. After the power supply is connected before going to work, it is necessary to check carefully, and the mixer can be used only after passing the test run without load. During the trial operation, it is necessary to check whether the speed of mixing drum is appropriate. In general, the speed of empty car is slightly faster than that of truck (after loading). If there is a large difference, the share of driving wheel and driving wheel should be adjusted.
3、拌筒的旋轉(zhuǎn)方向應(yīng)契合箭頭指示方向,如不符實(shí),應(yīng)更正電機(jī)接線。
3. The rotation direction of mixing drum shall be in accordance with the direction indicated by the arrow. If not, the motor wiring shall be corrected.
4、檢查傳動(dòng)離合器和制動(dòng)器是否靈活可靠,鋼絲繩有無損壞,軌道滑輪是否杰出,周圍有無妨礙及各部位的光滑狀況等。
4. Check whether the transmission clutch and brake are flexible and reliable, whether the wire rope is damaged, whether the track pulley is outstanding, whether there are obstacles around and the smoothness of various parts.
5、開機(jī)后,常常注意混凝土攪拌機(jī)各部件的作業(yè)是否正常。停機(jī)時(shí),常常檢查混凝土攪拌機(jī)葉片是否打彎,螺絲有否打落或松動(dòng)。
5. After starting up, pay attention to the normal operation of each part of the concrete mixer. When stopping the machine, often check whether the blades of the concrete mixer are bent and whether the screws are broken or loose.
6、當(dāng)混凝土攪拌完畢或預(yù)計(jì)停歇1h以上,除將余料出凈外,使用石子和清水倒入抖筒內(nèi),開機(jī)轉(zhuǎn)動(dòng),把粘在料筒上的砂漿沖洗干凈后悉數(shù)卸出。料筒內(nèi)不得有積水,避免料筒和葉片生銹。同時(shí)還應(yīng)整理攪拌筒外積灰,使機(jī)械保持清潔完好。
6. When the concrete mixing is finished or it is expected to stop for more than 1 h, in addition to discharging the remaining materials, the stone and water are poured into the shaking drum, and the machine is started to rotate. After the mortar glued to the barrel is washed, all the mortar is discharged. There should be no water in the barrel to avoid rust of the barrel and blade. At the same time, the dust accumulation outside the mixing drum should be sorted out to keep the machinery clean and intact.
7、下班后及停機(jī)不用時(shí),應(yīng)拉閘斷電,并鎖好開關(guān)箱,以確保。
7. After work and when the machine is not in use, the switch should be switched off and the switch box should be locked to ensure safety.
在對(duì)混凝土攪拌機(jī)進(jìn)行清洗時(shí)應(yīng)注意以下事項(xiàng):
Attention should be paid to the following matters when cleaning the concrete mixer:
一、定時(shí)進(jìn)行保養(yǎng)規(guī)程所規(guī)則項(xiàng)目的維護(hù)、保養(yǎng)作業(yè),如清洗、光滑、加油等
1、 Regularly carry out the maintenance and maintenance work of the items regulated by the maintenance regulations, such as cleaning, smoothing, oiling, etc
二、混凝土攪拌機(jī)開動(dòng)前要先檢查各控制器是否杰出,罷工后用水和石子倒入攪拌筒內(nèi)10~15分鐘進(jìn)行清洗,再將水和石子清出。操作人員如須進(jìn)入攪拌筒內(nèi)清洗時(shí),除切斷電源和卸下熔斷器外,并須鎖好開關(guān)箱。
2、 Before starting the concrete mixer, check whether the controllers are outstanding. After the strike, pour water and stones into the mixing drum for 10 ~ 15 minutes for cleaning, and then clear the water and stones. If the operator needs to enter the mixing drum for cleaning, in addition to cutting off the power supply and removing the fuse, the switch box must be locked.
三、制止用大錘擊打的方法鏟除積存在混凝土攪拌機(jī)筒內(nèi)的混凝土,只能用鑿子鏟除。
3、 It is forbidden to remove the concrete accumulated in the concrete mixer barrel by hammering. Only chisel can be used.
四、在嚴(yán)寒季節(jié),作業(yè)完畢后使用水清洗攪拌機(jī)滾筒并將水泵、水箱、水管內(nèi)積水放凈,避免水泵、水箱、水管等凍壞。
4、 In severe cold season, use water to clean the mixer drum after operation, and drain the accumulated water in water pump, water tank and water pipe to avoid freezing damage of water pump, water tank and water pipe.
以上是混凝土攪拌機(jī)操作時(shí)的檢查和清洗事項(xiàng)的相關(guān)介紹,相信大家都已知悉,想要了解更多內(nèi)容請(qǐng)繼續(xù)關(guān)注中科攪拌機(jī)http://pheenet.cn官網(wǎng)。
The above is the concrete mixer operation inspection and cleaning matters related to the introduction, I believe you all know, want to learn more, please continue to pay attention to the Zhongke mixer http://pheenet.cn Official website.